SURVEY
DESIGN AND APPROVALS
STRIP OUT AND FIRST FIX
SECOND FIX AND HANDOVER
We measure the property and check structure, services and access. That decides what stays, what comes out, and how long the job will take.
We coordinate the drawings, specification, structural engineer and building control before work starts, so the site is not waiting on decisions.
The building is opened up, temporary works go in, and structure, services and layout are set before any finishes.
Finishes, joinery and fittings are completed, snagged and handed over as a finished property.
HOW WE RUN REFURBISHMENT
he work is managed from the first survey to handover, with the decisions made before the finishes go in.
CLEAR SCOPE
ONE PROGRAMME
SIGNED-OFF FINISH
he survey, drawings and specification are agreed before the strip-out, so the site is not pricing hidden work as it appears.
Structure, services and finishes are sequenced by us. You are not left coordinating separate trades.
he property is snagged and handed over against the agreed specification, not left at second fix.